The 19-day, 57-storey skyscraper

Chairman Zhang’s flatpack skyscrapers: ‘Steel is delivered to one of Broad Group’s six huge hangar-like factories, where it is machine-cut and welded into one of a few basic modules – a column, crossbeam or floor section. These are then loaded on to lorries and driven to the site, where they are slotted into place like Tetris pieces, and finally bolted and welded together.’

This entry was posted in architecture. Bookmark the permalink.

Leave a Reply